boiler metal materials purchase tender technical specification book

boiler metal materials purchase tender technical specification book

Tender documentation for the procurement contract

The tenderer shall bear all costs associated with preparation and submission of his tender and the accompanying documents. 5. Scope of the contract 5.1. Contract title: PURCHASE & INSTALLATION OF NEW STEAM BOILER AND ENERGY RECOVERY SYSTEM (HEAT RECOVERING SYSTEM FROM CONDENSATION WATER) 5.2. Type of contract Delivery of products 5.3.

Get a Quote

TENDER DOCUMENT FOR STEAM GENERATION PLANT & …

TENDER DOCUMENT FOR STEAM GENERATION PLANT & AUXILIARIE…

Get a Quote

(PROJECT STANDARDS AND SPECIFICATIONS)

TENDER DOCUMENT FOR STEAM GENERATION PLANT & AUXILIARIE…

Get a Quote

Boiler Tenders - Tender News Portal - Tender Detail

The price to be charged for the tender document shall not exceed Kshs.1,000/= The procuring entity shall allow the tenderer to review the tender document free of charge before purchase. Contents of tender documents The tender document comprises of the documents listed below and addenda issued in accordance with clause 5 of

Get a Quote

MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION

should enclose a cop y of purchase order/ work order, to establish th eir experience, in the field. (2q) Tenderer should have experience for supply & installation of Multi Fuel Boilers. (2r) Tenderer should submit technical specification, drawing if any, of the items for which tender is invited, along with technical …

Get a Quote

Model Tender Document - clri.org

Tender No. 19(54)/R&D/boiler/Advt. No.35/809 Dated: 09.06.2012 This Tender Document Contains 184+ 2 (drawings ) = 186 Pages. Tender Documents is sold to: M/s Address Details of Contact person in SPM regarding this tender: Name, Designation : Shri. Rajkumar R Officer‐ Materials Address : Security Paper Mill Hoshangabad M.P‐461005

Get a Quote

TENDER DOCUMENT SUPPLY, ERECTION & COMMISSIONING …

INDUSTRIAL BOILERS (PROJECT STANDARDS AND SPECIFICATIONS) Page 6 of 27 Rev: 01 April 2011 3. Refractory material for surfaces other than the top of furnace floor tubes shall be per the following: Vanadium Content In Fuel Maximum Hot Face Refractory Operation Temperature Type Refractory Required >75 ppm >1700oF Synthetic mullite or 70% alumina

Get a Quote

TECHNICAL SPECIFICATIONS FOR BOILER QUALITY STEEL …

properties as per ASME/ASTM SA 537 Cl. 1 & other specifications enclosed to this tender document. Steel Plates supplied to this specification shall conform to specification SA-20 with additional requirements mentioned herein. 2.0 CHEMICAL COMPOSITION The steel plate material shall conform to following Chemical Composition as per ASTM A 537 Cl 1.

Get a Quote
Copyright © 2019 Boiler. All Rights Reserved.